The Rock Island Arsenal – Joint Manufacturing and Technology Center is groundbreaking – literally - to install a Thick Aluminum Line. The operation will allow for more advanced, robotically-controlled machining, material holding and paint removal. It’s expected to be operational in 2023.


Size: 4000px × 6000px
Photo credit: © Operation 2022 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: advanced, aluminum, arsenal, cente, island, joint, line, manufacturing, modernization, ria-jmtc, robotics, rock, technology, thick,