. Electric railway journal . Boston Improvements—Quarters of Division 7 at Cambridge, and Trip Sheet Report Desk in the Lobby and begun one-half hour before it closes. Two exits areprovided at each landing and the main exits at the headof the ramp when added make a total opening of about 94ft. through which the stream of passengers is lighting is provided during the fall season byfive-lamp clusters located above the ticket offices and nearthe entrances. The architectural features of the station height, with a basement, and is about 144 ft. long by 20 , of mill const


. Electric railway journal . Boston Improvements—Quarters of Division 7 at Cambridge, and Trip Sheet Report Desk in the Lobby and begun one-half hour before it closes. Two exits areprovided at each landing and the main exits at the headof the ramp when added make a total opening of about 94ft. through which the stream of passengers is lighting is provided during the fall season byfive-lamp clusters located above the ticket offices and nearthe entrances. The architectural features of the station height, with a basement, and is about 144 ft. long by 20 , of mill construction with brick walls and concretetrimmings. The first floor is devoted to a receivers office,including a lost article division with accommodations forinquirers, a conductors and motormens lobby about 80 , and offices for the division claim agent and attractive feature of the lobby is a special counter 412 ELECTRIC RAILWAY JOURNAL [Vol. XLI, No. io. for the making up of trip sheets, which has accommoda


Size: 1237px × 2021px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1900, bookidelectricrailway411913newy