. Electric railway journal . \*~&opening —>| -44. Floor Plan and Sections of Two-Unit Substation in the automatic substation in or out, regardless of themaster voltage relay. Further ability to dispatch the load so as to producethe lowest cost of power is provided by tying the 25-cycleHunt Street substation together with the 60-cycle Wal-nut Street substation by means of two 1,000,000 These cables are connected between the direct-current buses in the two stations so that it is possibleto shift the load from Hunt Street, supplied by thePendleton power house, onto Walnut Stree


. Electric railway journal . \*~&opening —>| -44. Floor Plan and Sections of Two-Unit Substation in the automatic substation in or out, regardless of themaster voltage relay. Further ability to dispatch the load so as to producethe lowest cost of power is provided by tying the 25-cycleHunt Street substation together with the 60-cycle Wal-nut Street substation by means of two 1,000,000 These cables are connected between the direct-current buses in the two stations so that it is possibleto shift the load from Hunt Street, supplied by thePendleton power house, onto Walnut Street substation,which is supplied with purchased power, or vice other words, depending on whichever is more eca- At the Hyde Park substation, where therehas been one 500-kw. converter, the com-pany has had a semi-automatic operationfor the past year. The station is equippedwith automatic reclosing circuit operator goes to the station at 4 ,starts the machine up at 5 oclock and re-mains until 8 The machine is then leftrunn


Size: 1965px × 1272px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1900, bookpublishernewyorkmcgrawhillp