Contractors for the Army Corps of Engineers Pittsburgh District use various floating barges to drill, demolish and remove the fixed-crest dam at the Monongahela River Locks and Dam 3 in Elizabeth, Pennsylvania, July 29, 2024. The Pittsburgh District initially breached the dam using controlled explosives on July 10. The district, while working with the contractor, will open a 100-foot-wide navigation channel through the existing dam, restoring a 9-foot draft to allow commercial navigation through the dam without using the lock. The district is committed to completing the 100-foot channe


Contractors for the Army Corps of Engineers Pittsburgh District use various floating barges to drill, demolish and remove the fixed-crest dam at the Monongahela River Locks and Dam 3 in Elizabeth, Pennsylvania, July 29, 2024. The Pittsburgh District initially breached the dam using controlled explosives on July 10. The district, while working with the contractor, will open a 100-foot-wide navigation channel through the existing dam, restoring a 9-foot draft to allow commercial navigation through the dam without using the lock. The district is committed to completing the 100-foot channel work by Aug. 28. The original projected timeline for opening the channel to navigation was December 2024. ( Army Corps of Engineers Pittsburgh District photo by Michel Sauret)


Size: 6000px × 4000px
Photo credit: © APFootage / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: army, corps, dam, demolition, district, engineers, fixed-crest, pittsburgh, usace