. Railway maintenance engineering, with notes on construction . 5 Boards ^1 <-2 Air Space ?Lifh%• Paper ^f Board _ rg Board^ Board 302 RAILWAY MAINTENANCE air being denser, will flow out through these openings at thebottom of the house and will be replaced by the warmer airdrawn in through the openings in the roof. This warmer airwill be cooled by contact with the ice and cause ice is a maxim in ice-house construction, that the space in whichthe ice is packed must be as nearly as possible entirely cut offfrom the out


. Railway maintenance engineering, with notes on construction . 5 Boards ^1 <-2 Air Space ?Lifh%• Paper ^f Board _ rg Board^ Board 302 RAILWAY MAINTENANCE air being denser, will flow out through these openings at thebottom of the house and will be replaced by the warmer airdrawn in through the openings in the roof. This warmer airwill be cooled by contact with the ice and cause ice is a maxim in ice-house construction, that the space in whichthe ice is packed must be as nearly as possible entirely cut offfrom the outer air, and it should be surrounded by an insulating VentilationZx 8 PI ate- 6 Opening


Size: 3048px × 820px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1910, bookpublishernewyo, bookyear1915