Electrical news and engineering . volt, 3 phase, 60 cycle generator for powerand lighting service, and a 100 kw. 500 volt direct currentgenerator for elevator and motors on sewage disposalsystem. There are installed at present six 125 boilersoperating at 100 lbs. pressure. These are equipped withJones underfeed stokers. A reducing value reduces thesteam pressure to 3 or 4 lbs, at which pressure it is usedfor both direct and indirect heating. There are installed atpresent three 50 kw. 2300/220/110 volt transformers fromwhich is supplied the lighting feeders on a three wire 110volt single p


Electrical news and engineering . volt, 3 phase, 60 cycle generator for powerand lighting service, and a 100 kw. 500 volt direct currentgenerator for elevator and motors on sewage disposalsystem. There are installed at present six 125 boilersoperating at 100 lbs. pressure. These are equipped withJones underfeed stokers. A reducing value reduces thesteam pressure to 3 or 4 lbs, at which pressure it is usedfor both direct and indirect heating. There are installed atpresent three 50 kw. 2300/220/110 volt transformers fromwhich is supplied the lighting feeders on a three wire 110volt single phase system. Three 25 kw. 2300/550 volttransformers supply power for operating the motors in thebuilding. A 500 volt direct current circuit supplies powerfor the four passenger elevators, and six freight elevatorsfor the train shed. A six panel Crouse-Hinds switchboarddistributes the power received from the above sources. As the basement of the building is below the sewerlevel, two sets of sewage receptacles are installed and the. Fort Garry Station—Ticket Lobby. sewage is lifted by compressed air, supplied by two com-pressors driven by direct current motors which start andstop automatically being coiilrolled by a pressure gaugewith solenoid switches. The building is drained in-to a sump which is automatically emptied by a motor drivencentrifugal pump controlled by a float switch. bor the indirect system of heating used on the groundlliior. ;iir is taken from the station platform and drawntlircjugh cloth screens and the steam pipes and forced bya large fan, driven by a 7yj 3 phase motor, variable THE ELECTRICAL NEWS S« speed into the large air ducts. Two similar fans drivenby 5 and to horse power motors are used for ventilatingpurposes. A tour horse povifer motor, tvifo speed, is directconnected to a centrifugal blower used for cleaning thedirt from the air screens above mentioned in connectionwith the heating apparatus. There will also be installeda 50 horse power thre


Size: 1843px × 1356px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bo, bookcentury1800, bookdecade1890, bookidelectricalnewsen20donm