Teesside Offshore Windfarm, UK. 15th January 2013. Jack Up heavy lift vessel MPI Adventure ready to move to port after installing the wind turbine nacelle and blades on the first two machines at Redcar Wind Farm January 2013. The turbines will be commissioned and start production while the remainder are being erected. The components for the turbines are loaded into the vessel in the nearby port of Hartlepool. This image shows the two completed turbines. Man throwing a stick for dog in the foreground.


Size: 4032px × 3024px
Photo credit: © Peter Jordan_NE / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: 2, beach, blade, blades, british, civil, construction, cost, dog, electricity, energy, engineering, english, erection, farm, final, generation, generator, green, inshore, installation, man, marine, nacelle, offshore, pjphoto59, redcar, rotor, rotors, sets, stage, teesside, throw, toy, turbine, wind, windfarm