. The street railway review . SHOWING LOC.\TION OP THE HIGH TENSION STATION. for 3,000 h. p. is available. The average delivery is from 5 to 6cubic meters per second. The intake canal is 1,100 ni. (3,600 ft.)long, 2 m. wide and m. deep, built of masonry and VIEW 01- IN SOFIA. The station building is 30 m. long and m. wide (about 98 x40 ft.). It is designed for 425-kw. units, four of which areinstalled. An annex ( x m. in area) is exclusively occupiedby the switchboard and the distribution apparatus. The turbines are constructed for a fall of from 52 to 55 m


. The street railway review . SHOWING LOC.\TION OP THE HIGH TENSION STATION. for 3,000 h. p. is available. The average delivery is from 5 to 6cubic meters per second. The intake canal is 1,100 ni. (3,600 ft.)long, 2 m. wide and m. deep, built of masonry and VIEW 01- IN SOFIA. The station building is 30 m. long and m. wide (about 98 x40 ft.). It is designed for 425-kw. units, four of which areinstalled. An annex ( x m. in area) is exclusively occupiedby the switchboard and the distribution apparatus. The turbines are constructed for a fall of from 52 to 55 a flow of from 960 to 910 litres of water per second withan efficiency of 75 per cent when developing 500 h. p. at 400 r. p. m. The turbines were built in the shops of Piccard, Pictet & Co.,Geneva, and are of the centrifugal type with horizontal staflf. Theadjusting may be made by hand or by means of a servo-motoractuated by the shaft of the turbine. A centrifugal governor servesas relay so that the number of revolutions always remains the same. The generators, each of 425 kw. capacity, are connected to theirrespective turbines by flexible insulated couplings. At 400 r. p. machines deliver current at 8,000 volts, the periodicity being53 1-3. The f


Size: 1284px × 1946px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., book, bookcentury1800, bookdecade1890, booksubjectstreetrailroads