Elaine Lisk (right), the supervisory business development program manager for the Army Corps of Engineers Pittsburgh District, talk to Nathan Wilson, dam maintenance operator, while touring the overview location at East Branch Clarion River Lake in Wilcox, Pennsylvania, March 26, 2021, to prepare for an upcoming ribbon-cutting ceremony and open house event for the public. Since issues with the dam were found in 2008, the Pittsburgh District has implemented various risk reduction measures, one of which was to lower the summer and winter pool levels in order to reduce hydraulic loads on and
Elaine Lisk (right), the supervisory business development program manager for the Army Corps of Engineers Pittsburgh District, talk to Nathan Wilson, dam maintenance operator, while touring the overview location at East Branch Clarion River Lake in Wilcox, Pennsylvania, March 26, 2021, to prepare for an upcoming ribbon-cutting ceremony and open house event for the public. Since issues with the dam were found in 2008, the Pittsburgh District has implemented various risk reduction measures, one of which was to lower the summer and winter pool levels in order to reduce hydraulic loads on and within the dam embankment. The summer pool level will return to 1670 feet (above sea level) for the first time in more than a decade.
Size: 1935px × 1292px
Photo credit: © Operation 2021 / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: army, dams, district, engineers, locks, pittsburgh, reservoirs, usace