Operation at a railway station at the Malmbanan. The build-up of electric power on the The works had begun in 1917, they were conducted so that electric power could be introduced between Kiruna and Gällivare on March 12, 1920. In 1921, electric operation was ready to Ripats on February 8, to Kilvo on August and Nattavaara on October. To Boden came on March 20, 1922 to finally reach the end point of Svartön outside Luleå.


Size: 2633px × 1898px
Photo credit: © BTEU/JANG / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: