. Railway master mechanic [microform] . y posts. (7) LAVATORY. COST PER SQ. FT. OF GROUND AREA. COST PER CU. FT. ITEM. BuildingOnly. Tools. Misc. Eqpt. Total. Building Only. Totnl. 239 NOTE. 201. Pacific Southwest, modern; brick and steel, has intermediate two-story lection lor sub departn 219 Middle West modern; average o( three large lavatories (including water closets, urinals, wash room and locker room I; 1 dings 0 rcti and brick with tile roots on wooden trusses; coincnt floors, complete with contents, ready to use. 296 RAILWAY MASTER MECHANIC July, 1904. OFFICE BUILDINGS COST PER SQ


. Railway master mechanic [microform] . y posts. (7) LAVATORY. COST PER SQ. FT. OF GROUND AREA. COST PER CU. FT. ITEM. BuildingOnly. Tools. Misc. Eqpt. Total. Building Only. Totnl. 239 NOTE. 201. Pacific Southwest, modern; brick and steel, has intermediate two-story lection lor sub departn 219 Middle West modern; average o( three large lavatories (including water closets, urinals, wash room and locker room I; 1 dings 0 rcti and brick with tile roots on wooden trusses; coincnt floors, complete with contents, ready to use. 296 RAILWAY MASTER MECHANIC July, 1904. OFFICE BUILDINGS COST PER SQ. FT OF GROUND AREA. COST PER CU. FT. ITEM. BuildingOnly. •Tools. Misc. Enpt. Total. BuildingOnly/ Total. 240 . . 241242 . .557 .295 -187 NOTES. 240. Middle West, old; frame building with brick Inundation, includes M. M. store department, steamt. 241. Middle West, modern; brick and wood, basement, two stories and attic, ornamental architecture. 242. Middle West, old; wooden, two stories and basement. (?) Based on use of fit (second-hand), 67 lb. on use of fit (second-hand), 85 lb. rail. Based on use of new rail, according to weight. TURNTABLES. ITEM. Diameter. Cost. NOTES. 240 70 247 1 76 ,091 Kxclusive of pit. (?) TRANSFER PITS AND TABLES. Cost per Sq. Ft. of Pit. ITEM. Pit. .31 .43 Table. Total. NOTES. 248249 . . Far West, rhodern; to handle the heaviest class of engines. East, modern; pit of concrete throughout; capacity of the table, 200 tons. MISCELLANEOUS STRUCTURES. ITEM. NAME. COST. NOTES. 250 $ per lineal foot. 251 Two sided with trestle ap- proach. (?) 252 1, total gal. capacity on timber trestle. (?) 253 Water pipe, underground laid. Large system, pipes from 12 to 4 inch. 254 Sewer pipe, underground laid per lineal foot Large system, pipes from 24 to 12 inch. 255 Long lines of wrought iron pipe per 100 lineal foot 1 in. dia. 1 Given by a large (for


Size: 2026px × 1233px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1800, bookdecade1890, bookidrailwaymaste, bookyear1895