. Electric railway journal . 1 ••! Locomotiut Inspection Siuiu<:/^Weet Bound Main llOOlWaverlj Tower. B. & O. ELECTRIFICATION- -MAP AND PROFILE OF ELECTRIFIEDLINE system was unsatisfactory, while the presence of gasesfrom steam locomotives resulted in high maintenancecost. In 1902 the overhead conductors were replaced bythird-rail system, the larger part of which is still inservice. A special form of protection has been pro-vided on account of flush platform construction at pas-senger stations. As a further safety measure auto-matic sectionalizing switches were installed, but theseproved un
. Electric railway journal . 1 ••! Locomotiut Inspection Siuiu<:/^Weet Bound Main llOOlWaverlj Tower. B. & O. ELECTRIFICATION- -MAP AND PROFILE OF ELECTRIFIEDLINE system was unsatisfactory, while the presence of gasesfrom steam locomotives resulted in high maintenancecost. In 1902 the overhead conductors were replaced bythird-rail system, the larger part of which is still inservice. A special form of protection has been pro-vided on account of flush platform construction at pas-senger stations. As a further safety measure auto-matic sectionalizing switches were installed, but theseproved unsatisfactory and were discontinued. To provide a continuous supply of current to the loco-motives at double slip switches where the gaps are toogreat to be spanned by the third-rail shoe, a special ar-
Size: 3401px × 735px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., bookcentury1900, bookdecade1900, bookpublishernewyorkmcgrawhillp