191029-N-BD319-016 NEWPORT NEWS, Va. (October 29, 2019) Pre-Commissioning Unit (PCU) John F. Kennedy (CVN 79) reaches another milestone in its construction as their dry dock area is flooded three months ahead of its slated production schedule leading up to the christening of the second Ford-class aircraft carrier, scheduled for Dec. 7. The flooding of the dry dock follows other milestones, including the laying of the ship’s keel on Aug. 22, 2015, the placement of the 588-metric ton island superstructure on May 29, 2019, and the arrival of the crew on Oct. 1, 2019. Kennedy is currently under


191029-N-BD319-016 NEWPORT NEWS, Va. (October 29, 2019) Pre-Commissioning Unit (PCU) John F. Kennedy (CVN 79) reaches another milestone in its construction as their dry dock area is flooded three months ahead of its slated production schedule leading up to the christening of the second Ford-class aircraft carrier, scheduled for Dec. 7. The flooding of the dry dock follows other milestones, including the laying of the ship’s keel on Aug. 22, 2015, the placement of the 588-metric ton island superstructure on May 29, 2019, and the arrival of the crew on Oct. 1, 2019. Kennedy is currently under construction at Huntington Ingalls Industries-Newport News Shipbuilding. ( Navy photo by Mass Communication Specialist 3rd Class Adam Ferrero)


Size: 6000px × 4000px
Photo credit: © APFootage / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., 79, cvn, dock, dry, john, kennedy, milestone, pcu