An interior photo of work done on a new transient training barracks building is shown April 15, 2021, at Fort McCoy, Wis. Contractor Black Constructors was awarded a $ million contract to build the barracks in September 2019. The planned completion date is later in 2021, and the facility is more than 80- percent complete. The planned barracks will be different than the traditional barracks that are located throughout the installation. This new building is four stories and be able to house 400 people in approximately 60,000 square feet. The project also is the first of eight new buildi
An interior photo of work done on a new transient training barracks building is shown April 15, 2021, at Fort McCoy, Wis. Contractor Black Constructors was awarded a $ million contract to build the barracks in September 2019. The planned completion date is later in 2021, and the facility is more than 80- percent complete. The planned barracks will be different than the traditional barracks that are located throughout the installation. This new building is four stories and be able to house 400 people in approximately 60,000 square feet. The project also is the first of eight new buildings planned for the entire 1600 block at Fort McCoy. The plan is to build three more barracks with the same specifications, three 20,000-square-foot brigade headquarters buildings, and one 160-room officer quarters. This is an Army Corps of Engineers-managed project.
Size: 1368px × 1825px
Photo credit: © Operation 2021 / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: barracks, construction, fort, mccoy, wisconsin