Construction of a new line route, 380 KV extra-high voltage line between Osterath and Gohr, near Neuss, fitters on the conductor cables, wind turbine,


Construction of a new line route, 380 KV extra-high voltage line between Osterath and Gohr, near Neuss, fitters on the conductor cables, wind turbine, at a great height, NRW, Germany,


Size: 5304px × 7952px
Photo credit: © Jochen Tack / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: 380, alternative, amprion, assembly, blades, cable, cables, conductor, construction, electricity, energies, energy, erect, erection, extra-high, fitter, fitters, generators, grid, height, high, high-voltage, infrastructure, kilovolt, kv, lattice, line, lines, masts, neuss, operator, overhead, park, plant, plants, power, propellers, pylon, pylons, regenerative, renewable, rhineland, rotors, route, site, skilled, steel, supply, transmission, turbine, voltage, wind, windmill, workers, wt