Leed Platinum Common Ground High School building. 15,000 square foot building was built in panels off-site.
Leed Platinum Common Ground High School building. 15,000 square foot building was built in panel off-site, then installed in pieces via crane. Outside walls come pre-insulated with shredded cellulose insulation. Project demonstrates new green architectural trend called mass timber construction.
Size: 7360px × 4912px
Location: New Haven, CT. USA
Photo credit: © Michael Doolittle / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: blue, boom, carpenter, carpenters, construction, crane, glulam, green, hard, hardhat, harness, hat, leed, mass, modular, operator, panel, panels, platinum, safety, sky, tether, timber, wall