. Railway age gazette . Switch-Freight, Scoop shovel Coal pick Water bucket Hoe or hook (either but not both) Poker Water cooler or jug (either but not both) Drinking cup Gage lamp Water gage glass lamp Front classiiication Rear marker lamps White lanterns Red lanterns White flags Green flags Red flags Torpedoes Red fusees 0 ] To be used only on loco- 0 [ motives on runs where 0 I more than one supply 0 J of oil is Only where required. J An extra second hand( shovel where required. Where required. - Where required. Where where required. examination of the


. Railway age gazette . Switch-Freight, Scoop shovel Coal pick Water bucket Hoe or hook (either but not both) Poker Water cooler or jug (either but not both) Drinking cup Gage lamp Water gage glass lamp Front classiiication Rear marker lamps White lanterns Red lanterns White flags Green flags Red flags Torpedoes Red fusees 0 ] To be used only on loco- 0 [ motives on runs where 0 I more than one supply 0 J of oil is Only where required. J An extra second hand( shovel where required. Where required. - Where required. Where where required. examination of the tools in use and note where they have beenfailing and to change the design to strengthen the particular toolat the point of failure. After this has been done the tool equip-ment and supplies should be checked and so arranged as to givethe best results. A very good way is to get together all ofthose concerned and thoroughly discuss the question, obtainingthe views of master mechanics, road foremen, assistant road forc-. Tempered Fig. 2—Chisel Made of Square Steel men and representative engineers and firemen. The operatingconditions should also be very carefully investigated, as it willhe found impossible on some divisions to get along with thesame amount of tools and supplies as on others. Form 1 will answer the purpose very well for a locomotivetool equipment and supply list. On this, only such tools as are FORM 2. A. B. C. RAILROAD COMPANY. Tool Inspectors Daily Report of Tools Missing ON Arrival of Locomotives. Jonesville Doe, Inspector. Engine Xo. 1000 875 Clark J. True Date, January 28, 6:00 A. 6:00 P. Despatched Time Tools From. Checked. Missing. Cameron 6:30 1 broom 1 12 in. wrench1 chisel Kent 6:40 A. M. FORM 3. A. B. C. RAILROAD COMPANY. Tool and Supply Clearance Ticket. Engine No Despatched from with following tools not on engine mum is to carefully revise the tool and supply equipment list sothat no tools are


Size: 2744px × 911px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1910, booksubjectrailroa, bookyear1913