. Appendix to the Journals of the Senate and Assembly of the ... session of the Legislature of the State of California. ing an expenditure of $.130,000. On June 30, 1928,two separations were under construction and jilans were under way fornineteen others budgeted to be built in the fiscal year ending June 30,11)29. The i)rogram for the eighty-first and eighty-second fiscal yearsincludes twenty-one such structures. The maximum number of structures built in any previous biennium was eight. Of the above eleven structures, two were reconstructions of existing,inadequate subways, o


. Appendix to the Journals of the Senate and Assembly of the ... session of the Legislature of the State of California. ing an expenditure of $.130,000. On June 30, 1928,two separations were under construction and jilans were under way fornineteen others budgeted to be built in the fiscal year ending June 30,11)29. The i)rogram for the eighty-first and eighty-second fiscal yearsincludes twenty-one such structures. The maximum number of structures built in any previous biennium was eight. Of the above eleven structures, two were reconstructions of existing,inadequate subways, one was on an entirely new line, and eight elimi-nated grade crossings. In addition, five grade were eliminatedby relocation of the liighway. On June 30,1928, there remained approxi-mately two hundred and sixty grade crossings of the state highwayover main line tracks and something over one hundred grade spur or switch tracks. The progress in the elimination of grade crossings is duel)rimarily to the additional funds now available from the gas DIVISION OP llIGnWAYS 67. Widened roadway on bridge near Tustin in Orange County.


Size: 2078px × 1202px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1800, bookdecade1850, bookidappendixtojo, bookyear1853