Construction machinery carrying out regulation works at the Odra river in order to adapt it to the class III waterway in Brody village. The Odra River is an important communication route, it is part of the E30 waterway connecting the Baltic Sea with the Danube in Bratislava. The E30 waterway in Poland covers the Odra River from the border with the Czech Republic to Swinoujscie, where the Swinoujscie LNG terminal is Germany and experts from the IGB Leibniz-Institute of Freshwater Ecology and Inland Fisheries call for the cessation of works aimed at expanding the Oder riverbed and re


Construction machinery carrying out regulation works at the Odra river in order to adapt it to the class III waterway in Brody village. The Odra River is an important communication route, it is part of the E30 waterway connecting the Baltic Sea with the Danube in Bratislava. The E30 waterway in Poland covers the Odra River from the border with the Czech Republic to Swinoujscie, where the Swinoujscie LNG terminal is Germany and experts from the IGB Leibniz-Institute of Freshwater Ecology and Inland Fisheries call for the cessation of works aimed at expanding the Oder riverbed and restoring floodplains. According to them, continuing the work may be conducive to killing the river's ecosystem.


Size: 5062px × 3375px
Photo credit: © SOPA Images / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: brody, class, communication, construction, e30, iii, machinery, odra, regulation, river, route, village, waterway, works