Grade and Alignment Improvements of Roads and Rivers. Original caption: 43-3534: At this point 1943 construction improved both the grade and alignment leaving a section of the 1943 army tote road beside it for comparison. Section E. Mile post 49 N. St. Johns. Original caption: 43-3535: Facing upstream from the Beatton River Bridge, a channel change has been made diverting the water from its twisting route at the left so that it now flows toward the bridge. Sec. E Mile post 101 N. St. Johns. Photo by Pinkstaff, Sept. 3, 1943. State: Alaska.


Size: 7019px × 5100px
Photo credit: © NB/PR / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: