. Canadian transportation & distribution management. oss the channel. Theirmovement back in rolling open leaves the channel and wharfedges entirely clear, saving space. This movement alsosaves many feet in length of span, thus reducing material,weight and motor power. For increased traffic extrabridges are placed beside the old ones, saving wasteful re-placement. One man operates one or many. Motor powerrequired is insignificant as the bridge rests upon its roller and merely needs to beROLLED forward or back. The foundation costs less because the superstructureis so simple and weighs less. Sch


. Canadian transportation & distribution management. oss the channel. Theirmovement back in rolling open leaves the channel and wharfedges entirely clear, saving space. This movement alsosaves many feet in length of span, thus reducing material,weight and motor power. For increased traffic extrabridges are placed beside the old ones, saving wasteful re-placement. One man operates one or many. Motor powerrequired is insignificant as the bridge rests upon its roller and merely needs to beROLLED forward or back. The foundation costs less because the superstructureis so simple and weighs less. Scherzer ROLLING Lift Bridges combine extraordinary efficiency, striking sim-plicity and low cost. Largest municipalities and corporations all over the worlduse and recommend them. Send for sketches, estimates and full information. flEARL Y 200Scherzer Rol-ling Lift Bridgesnow in successfuluse in the UnitedStates, Canada,England, Ireland,Wales, France,Belgium, Holland,Russia, Egypt,Burma, India,South America,Mexico, Hawai anIslands and Eastern Offi220 Broadway SchcrzerROLLING Lift Bridge Co. Main office Monadnock Block Chicago,USA


Size: 2532px × 987px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1910, bookpublisherdonmi, bookyear1913