Schutsluis the east of Sas van Gent Under the rule of a floodgate. Greatest length 15 M - weight 8550 kg Annotation: Broadening of the Ghent to Terneuzen, with locks at Terneuzen and Sas van Gent, bridges at Terneuzen, Sas van Gent and Sluiskil and an electricity generating plant at Terneuzen Date: 1906-1907 {} location: Sas van Gent Sas van Gent, Terneuzen, Terneuzen, Zeeland, Zeeland Keywords: channel work, locks, gates, expansion, engineering


Size: 3427px × 2918px
Photo credit: © BNA Photographic / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: