Air Force Staff Sgt. Bradly Salcedo (right), 621st Contingency Response Squadron aerial port supervisor, reviews documents with an inspector during a mobility exercise at Joint Base McGuire-Dix-Lakehurst Jan. 27, 2016. The purpose of the exercise was to assess 621st Contingency Response Group’s ability to prepare, ready and load personnel and equipment within 12 hours of receipt of a deployment order or tasking. The exercise scenario is based on allowing units the opportunity to accomplish limited planning training, and provide necessary framework to prepare forces in support of multiple


Air Force Staff Sgt. Bradly Salcedo (right), 621st Contingency Response Squadron aerial port supervisor, reviews documents with an inspector during a mobility exercise at Joint Base McGuire-Dix-Lakehurst Jan. 27, 2016. The purpose of the exercise was to assess 621st Contingency Response Group’s ability to prepare, ready and load personnel and equipment within 12 hours of receipt of a deployment order or tasking. The exercise scenario is based on allowing units the opportunity to accomplish limited planning training, and provide necessary framework to prepare forces in support of multiple taskings. ( Air Force photo by Staff Sgt. Robert Waggoner/RELEASED)


Size: 2784px × 1848px
Photo credit: © AB Forces News Collection / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: 621crw, 621st, airmen, contingency, exercise, military, mobex, mobility, response, usaf, wing