Motorway construction site on the A52 in Essen, basic renovation of both lanes in both directions, over 8 years, here the construction of concrete cra


Motorway construction site on the A52 in Essen, basic renovation of both lanes in both directions, over 8 years, here the construction of concrete crash barriers between the directional lanes, in the so-called sliding construction method, around 500 metres of concrete crash barrier is built per day, NRW, Essen


Size: 6336px × 9504px
Photo credit: © Jochen Tack / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: -situ, a52, autobahn, barriers, basic, carriageways, concrete, concreting, construction, crash, devices, die, directional, fibre-reinforced, gmbh, infrastructure, machinery, median, method, mixer, motorway, pavers, performance, profiles, protective, rehabilitation, restraint, safety, scraper, site, slipform, strips, system, traffic, transport, uhfb, ultra-high, wall, wallstop, work