. Electric railway journal . nally one set of cables was ordered from the Siemens-Schuckert Company and another from the Felten & Guil-leaume-Carlswerk Company. The Siemens-Schuckert transmission consists of two sistance per mile, 5420 megohms; capacity per mile, micro-farads; ohmic resistance per mile, BITTERFELD SUBSTATION The Bitterfeld substation was built to convert the 60,000- November 4, nji 1 .J ELECTRIC RAILWAY JOURNAL volt transmission current to 10,000 volts for the contactline. Two transformers with the necessary switching ap-paratus are installed for this purpose


. Electric railway journal . nally one set of cables was ordered from the Siemens-Schuckert Company and another from the Felten & Guil-leaume-Carlswerk Company. The Siemens-Schuckert transmission consists of two sistance per mile, 5420 megohms; capacity per mile, micro-farads; ohmic resistance per mile, BITTERFELD SUBSTATION The Bitterfeld substation was built to convert the 60,000- November 4, nji 1 .J ELECTRIC RAILWAY JOURNAL volt transmission current to 10,000 volts for the contactline. Two transformers with the necessary switching ap-paratus are installed for this purpose. The substation build-ing, with the exception of the transformer section, is twostories high. The lower floor contains a switch room, a 32- vice and are rated at 1800 kva. Contact thermometers areinstalled in the transformers to show the temperature of theoil and to close a circuit in the svvitchroom as soon as thecritical temperature is reached. The transformers werefurnished by the Allgemeine Company and the switching. Dessau-Bitterfeld Railway—Overhead Construction for Six Tracks at Jessnitz cell storage battery for operating the switches and lighting,and a high-tension room which contains the 10,000-volt and60,000-volt switches, and the oil and water resistances forthe lighting and high-tension discharge protective appara-tus. The horns for the latter and the 60,000-volt busbarsare placed on the upper floor. In addition to this equipment,the switch room contains a small motor-generator set andtelephone. The two main transformers are placed in individual cellswhich were carefully designed to insure clean air for cool- equipment and protective devices by the Siemens-SchuckertCompany. OVERHEAD LINE CONSTRUCTION The overhead lines between Bitterfeld and Raguhn werefurnished by the Allgemeine Company, while the sectionfrom Raguhn to Dessau was installed by the Siemens-Schuckert Company. Throughout the entire system greatcare was exercised in designing the supporting structure


Size: 2620px × 954px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1900, bookpublishernewyorkmcgrawhillp