. Electric railway review . een the pump and the discharge valve the operationwill be satisfactory. If the suction main for a pump is underground it shouldbe made of cast iron and if it is subject to vibration, set-tlement of ground or excessive expansion strains it shouldbe flanged and have metal gaskets. The most satisfactoryarrangement for long underground suction connections is tolocate the underground piping at a level below the waterinlet or water surface and build the lift pipe so that it isexposed free to expand and opportunity is afforded for readilymaking repairs. Figure 214-(F1-1) w


. Electric railway review . een the pump and the discharge valve the operationwill be satisfactory. If the suction main for a pump is underground it shouldbe made of cast iron and if it is subject to vibration, set-tlement of ground or excessive expansion strains it shouldbe flanged and have metal gaskets. The most satisfactoryarrangement for long underground suction connections is tolocate the underground piping at a level below the waterinlet or water surface and build the lift pipe so that it isexposed free to expand and opportunity is afforded for readilymaking repairs. Figure 214-(F1-1) will illustrate the detailsof a very satisfactory arrangement of piping for such well should be about 3 feet in diameter, have aladder inside and a man-hole top covering so arranged thatthe suction pipe will be supported from above. If the water-line, a, to the well is large, about 24 or 30 inches in diam-eter, it may be built of clay sewer pipe with cementedjoints which will prevent any leakage of sand. The con-.


Size: 1155px × 2164px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1900, booksubjectstreetr, bookyear1906