CAPE CANAVERAL, Fla. – In the Astrotech payload processing facility at Port Canaveral, Fla., supplies and other cargo are prepared for installation in the Russian-built Mini-Research Module, or MRM, in the background. The six-member crew of space shuttle Atlantis' STS-132 mission will deliver an Integrated Cargo Carrier and the MRM to the International Space Station. The second in a series of new pressurized components for Russia, the MRM will be permanently attached to the bottom port of the Zarya module. The MRM also will carry pressurized cargo. STS-132 is the 34th mission to the stati


CAPE CANAVERAL, Fla. – In the Astrotech payload processing facility at Port Canaveral, Fla., supplies and other cargo are prepared for installation in the Russian-built Mini-Research Module, or MRM, in the background. The six-member crew of space shuttle Atlantis' STS-132 mission will deliver an Integrated Cargo Carrier and the MRM to the International Space Station. The second in a series of new pressurized components for Russia, the MRM will be permanently attached to the bottom port of the Zarya module. The MRM also will carry pressurized cargo. STS-132 is the 34th mission to the station and the 132nd space shuttle mission. Launch is targeted for May 14.


Size: 3000px × 1996px
Photo credit: © NASA/piemags / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., spacehab