Topic photo Emscher renovation, the Emscher system will be wastewater-free in 2021 - new construction of a sewer on the Boye, the second largest tribu
Topic photo Emscher renovation, the Emscher system will be wastewater-free in 2021 - new construction of a sewer on the Boye, the second largest tributary of the Emscher, concrete pipes with hydraulic joints enable stronger cornering, the Boye will be renatured, converted into a natural body of water, was previously an open, above-ground wastewater sewer , Mixed water canal with surface water and wastewater, the ecological reconstruction of the Emscher system consists of the construction of a central wastewater treatment system in the Ruhr area, the construction of sewers and the renaturation of the Emscher and its tributaries, archive picture from , Bottrop, Ruhr area, North Rhine-Westphalia, Germany .
Size: 3840px × 5760px
Photo credit: © mauritius images / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ambience, area, basin, body, bottrop, build, build-, building, builds, built, canal, channel, civil, concrete, conservation, construct, constructing, construction, contstruction, deep, drain, eco, ecological, ecology, economica, economics, economy, emschersystem, engineering, environment, environmental, environmentalism, environments, europe, european, german, germany, green, industry, infrastructure, investment, living, management, measure, nature, newbuilt, north, pipe, pipeline, probe, protection, reconstruction, renaturation, resource, resources, rhine-westphalia, river, ruhr, running, sanction, sensor, sewage, sewer, site, structure, system, trade, trades, tube, tubes, tunnel, wastewater, water, waters, work, worker, workers, works