. Cost of power in Japan (10,000 K. W. steam, gas and hydro-electric plants) . POWER STATOIN EQUIPMERT,(A) OMERATORS. Si«aiii Thara ar« 5 units of three phase,2000 each rated out-put with over loadcapacity per cent. The available is therefore, say 8000, allowing oneunit in reserve. Gas Ihere are 7 units of three phase,1450 nomal, 1600 over the ease of a gas plant it must be remea-bered that the engines are incapable of morethan 12 to 15 per cent, available , demand is therefore, say7500, a].lowable twq unit^ reserve or one
. Cost of power in Japan (10,000 K. W. steam, gas and hydro-electric plants) . POWER STATOIN EQUIPMERT,(A) OMERATORS. Si«aiii Thara ar« 5 units of three phase,2000 each rated out-put with over loadcapacity per cent. The available is therefore, say 8000, allowing oneunit in reserve. Gas Ihere are 7 units of three phase,1450 nomal, 1600 over the ease of a gas plant it must be remea-bered that the engines are incapable of morethan 12 to 15 per cent, available , demand is therefore, say7500, a].lowable twq unit^ reserve or one setin reserve and one under repair, asjin resonablein a coiamercial gas power station. Hydro-elecrlc Sh«re are 7 units of throephase, 1650 uoraal, 1980 turbines are about the same over loadcapacity to gas engines, and there ar© thetransmission line loss of IG per cent., and 7 th« loss due to step itp and step dowi transfor-mers of 2 per e«xt., h«iee it has the same aaamount of out-put on the sidteh board of thesubstation, as the othe
Size: 1277px × 1957px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., bo, bookcentury1900, bookdecade1910, bookidcostofpowerinjap00sasa