. Railway mechanical engineer . awing will be found the essential details of con-struction of an air brake testing device for use at locomotiveinspection pits, which makes possible the completion of thenecessary brake equipment tests on arrival at the terminalin about 12 minutes. Essentially, the device is a crane for supporting the in-spectors test gage and orifice valve with suitable connec-tions to the signal and train lines, at a height such that itmay be swung into the cab at the gangway, with the equip-ment within convenient reach of the inspector conducingthe tests. The test equipment i


. Railway mechanical engineer . awing will be found the essential details of con-struction of an air brake testing device for use at locomotiveinspection pits, which makes possible the completion of thenecessary brake equipment tests on arrival at the terminalin about 12 minutes. Essentially, the device is a crane for supporting the in-spectors test gage and orifice valve with suitable connec-tions to the signal and train lines, at a height such that itmay be swung into the cab at the gangway, with the equip-ment within convenient reach of the inspector conducingthe tests. The test equipment is supported at the end of atelescopic horizontal arm, which may be closed and swungout of the way parallel to the track when not in use. Thetest equipment is coupled up to the train and signal lines atthe rear end of the tender by means of hose and standardcoupling, from which pipe lines lead along the side of theinspection pit and up through the base of the crane. Fromthe upper end of these pipes hose connections of sufficient. s J fill J


Size: 2121px × 1178px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1910, booksubjectrailroadengineering