Engineers prepare replacement track components before using thermite welding on London Underground rail track, London, UK


Engineers weld replacement track components together in a tunnel using thermite welding on London Underground rail track, London, UK London Underground engineers use "Thermite" welding unit placed on the top of a Train track using sheer heat to melt a small amount of steel and the two lines of steel rail it needs to join,the extreme heat produced melts both track ends and a small amount of added steel to produce a perfect weld between both lines which can be ground off to produce a perfect joint. Using clay molds and pans either side to collect any excess material produced or "boiled"off during the weld.


Size: 7200px × 4800px
Location: Tottenham Hale, North London, London Borough of Haringey, England, UK
Photo credit: © Jeff Gilbert / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: line bakerloo, line central, line circle, line piccadilly, line victoria, line welder welding, london, london northern, maintenance tube, night, night-shift, shift, thermite welding track exothermic maintenance, thermite welding track exothermic maintenance london, thermite welding track tunnel exothermic maintenance london, track steel tube tracks transport, track steel tube tracks welder welding, track thermic, underground, underground contractor tfl upgrade track, underground repair engineer thermit transport thermic welding underground workers railtrack rail, underground track, unit engineers london, unit engineers tunnel, upgrade, upgrade london, welding exothermic, welding maintenance, welding thermite, worker hidden, worker london, workers, world