At the Everglades Agricultural Area (EAA) Reservoirs construction site, processes excavated material for the construction of the foundation and dike walls is processed onsite. The material is sifted through and checked to ensure it meets building standards. The overarching goal of the Central Everglades Planning Project (CEPP) is to improve the quantity, quality, timing, and distribution of water flows to the Everglades, Water Conservation Area 3 (WCA-3) and Everglades National Park (ENP). The purpose of the Central Everglades Planning Project (CEPP) Everglades Agricultural Area (EAA) Reserv
At the Everglades Agricultural Area (EAA) Reservoirs construction site, processes excavated material for the construction of the foundation and dike walls is processed onsite. The material is sifted through and checked to ensure it meets building standards. The overarching goal of the Central Everglades Planning Project (CEPP) is to improve the quantity, quality, timing, and distribution of water flows to the Everglades, Water Conservation Area 3 (WCA-3) and Everglades National Park (ENP). The purpose of the Central Everglades Planning Project (CEPP) Everglades Agricultural Area (EAA) Reservoir Phase is to construct a 240,000 acre-foot EAA reservoir and 6,500 acre-foot stormwater treatment area, and integrate with A-1 FEB operations. ( Army Photo by Brigida I. Sanchez)
Size: 4500px × 2801px
Photo credit: © APFootage / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: