. History of Waterbury and the Naugatuck Valley, Connecticut . Ulo. heresigned his position as electrical engineer with the New Haven road to form the tirm ofMcHenry & Murray, engineers, of New Haven, Connecticut, ]\lr. IMcHenry resigning his oHiceas engineering vice president of the New Haven roail at the same time. This firm took overall the electrical engineering and construction of the New Haven road and finished theelectrification between New York and New Haven in 1914. This firm also actively took up thematter of the development of the Housatonic river for the purpose of supplying the Ne


. History of Waterbury and the Naugatuck Valley, Connecticut . Ulo. heresigned his position as electrical engineer with the New Haven road to form the tirm ofMcHenry & Murray, engineers, of New Haven, Connecticut, ]\lr. IMcHenry resigning his oHiceas engineering vice president of the New Haven roail at the same time. This firm took overall the electrical engineering and construction of the New Haven road and finished theelectrification between New York and New Haven in 1914. This firm also actively took up thematter of the development of the Housatonic river for the purpose of supplying the NewHaven road with the additional electric power necessary to operating all trains electricallyon its New York division. ]\Ir. Muirays and ^Ir. ^IcHenrys interest in this proposed Housa-tonic river development has led to their association with the Connecticut Light & PowerCompany of Waterbury, Connecticut, of which Mr. Murray is now chief engineer, in charge ofengineering consj ruction inn! power inoiluct ioii. and in which coni|iaiiy ^fr. McHeniy is a.


Size: 1371px × 1823px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1910, booksubjectwaterbu, bookyear1918