Men testing bolt tightness during the construction of base tower. 32-megawatt Drumderg wind farm erection at Drumderg wind farm Alyth Scotland uk


Most large wind turbines are delivered with tubular steel towers, which are manufactured in sections of 20-30 metres with flanges at either end, and bolted together on the site. The towers are conical ( with their diameter increasing towards the base) in order to increase their strength and to save materials at the same time.


Size: 3413px × 5120px
Location: Alyth Scotland uk
Photo credit: © MediaWorldImages / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: -vis, 32-megawatt, alyth, assembly, base, bolt, bolting, bolts, carbon, commercial, drumderg, earthed, electricity-generating, energy, exterior, farm, farms, fasten, fastening, gas, gigantic, green, greenhouse, hard, hat, industrial, industry, installations, machinery, men, moorland, output, power, procedure, rachet, reduction, remote, renewable, rural, scotland, scottish, securing, site, snow, technologies, tool, torque, tower, towers, turbine, turbines, vertical, wind, wind-farm, wind-farms, windfarm, windtowers, windturbine, winter, workmen