Oberhausen, Ruhr area, North Rhine-Westphalia, Germany - Emscher conversion, new construction of the Emscher AKE sewer, here the new pumping station in Oberhausen, the ecological conversion of the Emscher system consists of the construction of a central sewage treatment system in the Ruhr area, the construction of sewers and the renaturation of the Emscher and its tributaries, the dirty water river Emscher flows in the back left.


Size: 6720px × 4480px
Location:
Photo credit: © Rupert Oberhäuser / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: -, aerial, aerially, ake, ambience, angle, area, aspects, bgi, bird, bird-eye, bird`, birds, blue-green, body, build, build-, building, bulk, canal, central, conservation, consists, construct, constructing, construction, conurbation, conversion, countryside, crane, dirty, eco, ecological, ecology, economica, emscher, environment, eye, flows, germany, industry, infrastructure, left., north, oberhausen, photographing, project, pumping, renaturation, rhine-westphalia, river, ruhr, sewage, sewer, sewers, shot, site, station, structure, system, trade, trades, treatment, tributaries, veiw, view, water, work, works