Electrical news and engineering . Winnipegs Hydro Manager Mr. John G. Glassco, manager WinnipegHydro-electric System, was born at Hamil-ton, Ont., in 1879 and was educated at thePublic and High Schools in Hamilton, and atMcGill University, Montreal, graduating withthe Master of Science degree in electrical en-gineering. He was at first in the employ ofthe Montreal Light. Heat & Power Company,in 1900, but subsequently returned to the uni-versity as demonstrator and lecturer. In 1903he went to Los Angeles, talifornia, as super-intendent of Meter and Repair Departmentsof the Southern California E


Electrical news and engineering . Winnipegs Hydro Manager Mr. John G. Glassco, manager WinnipegHydro-electric System, was born at Hamil-ton, Ont., in 1879 and was educated at thePublic and High Schools in Hamilton, and atMcGill University, Montreal, graduating withthe Master of Science degree in electrical en-gineering. He was at first in the employ ofthe Montreal Light. Heat & Power Company,in 1900, but subsequently returned to the uni-versity as demonstrator and lecturer. In 1903he went to Los Angeles, talifornia, as super-intendent of Meter and Repair Departmentsof the Southern California Edison 1905 he was appointed chief engineer ofthe Dominion Power & Transmission Com-pany, Hamilton, and held this positionuntil he moved to Winnipeg in 1909, as chiefelectrical engineer of the power constructionwork oi the city of Winnipeg. He was ap-pointed power engineer in 1911, in 1912 be-came manager of the Hydro-electric Systemand has occupied this position since that the interval he has witn


Size: 1359px × 1839px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bo, bookcentury1800, bookdecade1890, bookidelectricalnewsen31donm