. The Street railway journal . hdischarge static electricity readily, but through which there is aleakage from the station of only about i-io amp. at 20,000 LINE From the central station the three primary conductors at20,000 volts lead across the Adda to Morbegno, where theydivide. Towards Sondrio the lines are carried to consist of three soft copper wires of 7-mm diameter. Inthe other direction, i. e., toward Colico the conductor consistsof three wires each of 8-mm diameter. At Colico the conductoragain branches, one set going north to the last transformerstati


. The Street railway journal . hdischarge static electricity readily, but through which there is aleakage from the station of only about i-io amp. at 20,000 LINE From the central station the three primary conductors at20,000 volts lead across the Adda to Morbegno, where theydivide. Towards Sondrio the lines are carried to consist of three soft copper wires of 7-mm diameter. Inthe other direction, i. e., toward Colico the conductor consistsof three wires each of 8-mm diameter. At Colico the conductoragain branches, one set going north to the last transformerstation on this section, which is situated at a distance of before Chiavenna is reached, and south to conductors consist of soft copper wires of 7-mm primary conductors and the distribution of the transformerstation are illustrated in Fig. 11. The pole line consists of larchpoles, with a minimum diameter of 10 ins. at the upper, and aminimum diameter of i ft. at the lower end. Before the erection.


Size: 1807px × 1383px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1800, bookdecade1880, booksubjectstreetr, bookyear1884