. Electric railway journal . HOW MOTOR IS SUSPENDEDFROM CAR FLOOR held in place with a special nut screwed on the endwhich projects up through the channel. Although there is a saving of time, even for onepair of wheels, as compared with the wheel pit meth-od, the proportionate saving is much greater for twoor more pairs. In cases when four axles are to be re-moved, the relative time required per axle comparedwith the former method has been found to be roughlyone to three. VIEW OF CAR HOISTED TO RECEIVE NEW WHEELS Aluminum Catenary Construction IN THE usual catenary construction, the contactsys


. Electric railway journal . HOW MOTOR IS SUSPENDEDFROM CAR FLOOR held in place with a special nut screwed on the endwhich projects up through the channel. Although there is a saving of time, even for onepair of wheels, as compared with the wheel pit meth-od, the proportionate saving is much greater for twoor more pairs. In cases when four axles are to be re-moved, the relative time required per axle comparedwith the former method has been found to be roughlyone to three. VIEW OF CAR HOISTED TO RECEIVE NEW WHEELS Aluminum Catenary Construction IN THE usual catenary construction, the contactsystem is not depended on for power wires were formerly used for this service, butwhere traffic is heavy they have been largely replacedby bronze or steel wires. These wear better, but havepoorer conductivity. The necessary conductivity in thecatenary system has been obtained on the Lake ErieNorthern Railway, as explained in the January issue ofthe Electric Journal, by wrapping the conductoraround the steel


Size: 2041px × 1225px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1900, bookpublishernewyorkmcgrawhillp