. The Street railway journal . LONGITUDINAL SECTIONAL ELEVATION OF PIPING VIEWED FROM THE WEST January 7, 1905.] STREET RAILWAY JOURNAL. 13 conditions there is more exhaust steam than is required, andthe condensers and exciter engines are arranged to run con-densing at will. However, when the entire plant is working upto its rating, it will require the exhaust from all these auxil-iaries to maintain a feed temperature of 200 degs. A test of15,000 lbs. of water passing through heater with the exhaust. ONE OF THE GENERATORS taken from a cold well outside the building, which is suppliedby gravity


. The Street railway journal . LONGITUDINAL SECTIONAL ELEVATION OF PIPING VIEWED FROM THE WEST January 7, 1905.] STREET RAILWAY JOURNAL. 13 conditions there is more exhaust steam than is required, andthe condensers and exciter engines are arranged to run con-densing at will. However, when the entire plant is working upto its rating, it will require the exhaust from all these auxil-iaries to maintain a feed temperature of 200 degs. A test of15,000 lbs. of water passing through heater with the exhaust. ONE OF THE GENERATORS taken from a cold well outside the building, which is suppliedby gravity from the park lake through a line 1000 ft. long. Thedischarge is delivered to a hot-well outside the building, andthe overflow returns to the lake by gravity. The spraying at-tachment of the condenser is permanent, and the vacuum iscontrolled by a throttle valve in the suction line operated from


Size: 1801px × 1388px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1800, bookdecade1880, booksubjectstreetr, bookyear1884