. Annual report 1921. room floors at elevations 717, 732 and 740were poured by April 30th and the control room bay floors at elevations 716,724, 740 and 752 by May 10th. The gatehouse Avails were completed onJune 25th and the pouring of the roof about the same date. The last of thewindow-sash supplied by the Trussed Concrete Steel Company was placed inposition about June 25th, but glazing was not finished until October 1st. The progress of work in connection with the erection of the power housesuperstructure Avas expedited considerably by the unusually mild AvinterAveather experienced, but Ava


. Annual report 1921. room floors at elevations 717, 732 and 740were poured by April 30th and the control room bay floors at elevations 716,724, 740 and 752 by May 10th. The gatehouse Avails were completed onJune 25th and the pouring of the roof about the same date. The last of thewindow-sash supplied by the Trussed Concrete Steel Company was placed inposition about June 25th, but glazing was not finished until October 1st. The progress of work in connection with the erection of the power housesuperstructure Avas expedited considerably by the unusually mild AvinterAveather experienced, but Avas hampered to a certain extent by shortness oflabor in the summer Houses On May 20th an order Avas placed with the Canadian Aladdin Companyfor four detached houses (one 8 rooms, one 7 rooms, and two 6 rooms) and onepair of semi-detached houses (each 6 rooms). Three of the detached housesand the semi-detached houses have been erected by the Construction Depart- 1922 HYDRO-ELECTRIC POWER COMMISSION 227. 228 FOURTEENTH ANNUAL REPORT OF THE No. 49


Size: 1323px × 1888px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1920, bookidannualreport, bookyear1921