KENNEDY SPACE CENTER, FLA. -- Dwarfing the vehicles on the road alongside the crawlerway, Space Shuttle a href='..' Atlantis _a rolls back to the a href='..' Vehicle Assembly Building _a from a href='..' Launch Pad 39A _a via the crawler-transporter underneath the Mobile Launcher Platform. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory r


KENNEDY SPACE CENTER, FLA. -- Dwarfing the vehicles on the road alongside the crawlerway, Space Shuttle a href='..' Atlantis _a rolls back to the a href='..' Vehicle Assembly Building _a from a href='..' Launch Pad 39A _a via the crawler-transporter underneath the Mobile Launcher Platform. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6


Size: 1752px × 2670px
Photo credit: © NASA/piemags / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: .