Canadian engineer . KERR STEAM TURBINE Works, 512 WILLIAM ST., MONTREAL THE JOHN McDOUGALLCALEDONIAN IRON WORKS CO LIMITED. 64 THE CANADIAN ENGINEER Volume 22. St. Vital, Man.—Plans have been prepared by the muni-cipal engineer, Mr. D. R. Baribault, calling for the expendi-ture of $500,000 on sewer and water system plans call for the erection of a water purification plantto cost $200,000. Toronto, Ont.—The municipal council are consideringthe following works expenditure : New meters $ 100,000 Two 36-inch mains under tracks, Main Pumping Station to Front Street 44,45Q 42-inch m


Canadian engineer . KERR STEAM TURBINE Works, 512 WILLIAM ST., MONTREAL THE JOHN McDOUGALLCALEDONIAN IRON WORKS CO LIMITED. 64 THE CANADIAN ENGINEER Volume 22. St. Vital, Man.—Plans have been prepared by the muni-cipal engineer, Mr. D. R. Baribault, calling for the expendi-ture of $500,000 on sewer and water system plans call for the erection of a water purification plantto cost $200,000. Toronto, Ont.—The municipal council are consideringthe following works expenditure : New meters $ 100,000 Two 36-inch mains under tracks, Main Pumping Station to Front Street 44,45Q 42-inch main along Front Street to Bathurst Street 55,04824-inch main along Niagara Street to Queen Street 33,53536-inch main cross town line, Beverley Street to Sumach Street 148,477 North Vancouver, —The municipal council intendto spend $137,000 on sewers and roadways. » o • BUILDINGS AND INDUSTRIAL WORKS. Calgary, Alta A report states that the Sunlight Soap interests are considering the matter of establishing a factoryin this city. Mr. Knight is the manager of the Torontobranch. Calgary, Alta.—The management


Size: 1906px × 1311px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1800, bookdecade1890, bookpublishertoron, bookyear1893