Theme photo Emscher conversion, the Emscher system will be free of wastewater in 2021 - new construction of a sewer on the Boye, the second largest tr


Theme photo Emscher conversion, the Emscher system will be free of wastewater in 2021 - new construction of a sewer on the Boye, the second largest tributary of the Emscher, during tunnel driving, the excavated soil is lifted out of the shaft in a trolley and the concrete pipes are grouted, the Boye is renaturalized, is transformed into a near-natural watercourse, was previously an open, surface sewer, combined sewer with surface water and wastewater, the ecological conversion of the Emscher system consists of the construction of a central wastewater treatment system in the Ruhr area, the construction of sewers and the renaturation of the Emscher and its tributaries, archive photo from 13. , Bottrop, Ruhr area, North Rhine-Westphalia, Germany.


Size: 5760px × 3840px
Photo credit: © Rupert Oberhäuser / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: 3500, area, bgi, blue-green, bored, bottrop, boye, build, canal, canalization, civil, concrete, conservation, construction, dn, ecological, ecology, economy, emscher, engineering, environment, environmental, europe, european, format, german, germany, green-blue, green-blue-infrastructure, horizontal, industry, infrastructure, investment, lore, management, manhole, measure, nature, north, nrw, pile, pipe, pipes, prepress, press, project, protection, push, qf, reconstruction, renaturation, resource, resources, rhine-westphalia, river, ruhr, sewage-free, sewer, shaft, site, system, tube, tunnel, tunneling, wall, wastewater, water, watercourse, work