. Design considerations for seafloor foundations on rock. Ocean bottom; Underwater construction. cable Weight in Air Weight in Water Hydrophone Height Above Base Diameter of Base Ring C. G. Above Base in Air C. G. Above Base in Water Yoke Pivot Above Base Free Fall Velocity yoke (aluminum (in up position) the yoke is horizontal when the assembly is installed in water base ring (PVC). 502 lb 360 lb 15 ft 12 ft in. in. in. ft/sec anchor (steel) Figure 1. BARSTUR hydrophone assembly. Please note that these images are extracted from scanned page images that may have been digi


. Design considerations for seafloor foundations on rock. Ocean bottom; Underwater construction. cable Weight in Air Weight in Water Hydrophone Height Above Base Diameter of Base Ring C. G. Above Base in Air C. G. Above Base in Water Yoke Pivot Above Base Free Fall Velocity yoke (aluminum (in up position) the yoke is horizontal when the assembly is installed in water base ring (PVC). 502 lb 360 lb 15 ft 12 ft in. in. in. ft/sec anchor (steel) Figure 1. BARSTUR hydrophone assembly. Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original Valent, P. J. Port Hueneme, Calif. : Naval Civil Engineering Laboratory


Size: 1208px × 2069px
Photo credit: © Paul Fearn / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookcollectionbiodivers, booksubjectoceanbottom