. Railroad structures and estimates . TABLE 84. — APPROXIMATE ESTIMATE OF COST PER LINEAL FOOT. Items. Excavation BackfiU, Piles (wood) Drainage Concrete (plain) Concrete (reinforced).Steel Supervision Total cost per lineal foot of viaduct. :;ection A (22 ft. 6 in. high),reinforced wall. 6 cu. cu. lin. lin. cu. yds. 5 cu. lbs. 6 sq. cu. (about) $ $ $ Section B (22 ft. 6 in. high),semi-gravity wall. 6 cu. y
. Railroad structures and estimates . TABLE 84. — APPROXIMATE ESTIMATE OF COST PER LINEAL FOOT. Items. Excavation BackfiU, Piles (wood) Drainage Concrete (plain) Concrete (reinforced).Steel Supervision Total cost per lineal foot of viaduct. :;ection A (22 ft. 6 in. high),reinforced wall. 6 cu. cu. lin. lin. cu. yds. 5 cu. lbs. 6 sq. cu. (about) $ $ $ Section B (22 ft. 6 in. high),semi-gravity wall. 6 cu. yds. $ 3 cu. yds. 60 lin. ft. Per lin. ft. cu. yds. Nil. Nil. 500 lbs. 6 sq. yds. 38 cu. yds. 10% (about) $ Nil. $ Ties, ballast, rail and fastenings, or hand rail, common to all schemes are not included. (169) 170 COST OF VL\DUCT —FILL AND RETAINING W.\LLS. CELLULAR RETAINING WALL, MILWAUKEE TRACK TRACK VIADUCT, RETAINING
Size: 2081px × 1200px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., bookauthororrockjohnwilson1870, bookcentury1900, bookdecade1910