A portion of the 60-inch 1-1/2 mile long belt conveyor in the near foreground; the 3,000 ft. cellular steel cofferdam; the cross-river conveyor carrying material from the east side excavation to the main line conveyor on the west side; behind the cofferdam in the center of the picture, and between the two cell clusters, can be seen the new cells that will tie the cluster cells to the ends of the first block of concrete in the Grand Coulee Dam.; Scope and content: Photograph from Volume Two of a series of photo albums documenting the construction of the Grand Coulee Dam and related work on the


A portion of the 60-inch 1-1/2 mile long belt conveyor in the near foreground; the 3,000 ft. cellular steel cofferdam; the cross-river conveyor carrying material from the east side excavation to the main line conveyor on the west side; behind the cofferdam in the center of the picture, and between the two cell clusters, can be seen the new cells that will tie the cluster cells to the ends of the first block of concrete in the Grand Coulee Dam.; Scope and content: Photograph from Volume Two of a series of photo albums documenting the construction of the Grand Coulee Dam and related work on the Columbia Basin Project.


Size: 5394px × 3707px
Photo credit: © Alpha Stock / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: