A crane lifts a transition piece of a wind turbine onto a jack up barge, ready to construct the Walney offshore wind farm
A massive crane lifts a 320 tonne transition piece onto the deck of the jack up barge, The Goliath ready to take out to the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, MW turbines, giving a total capacity of the Walney project of MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
Size: 5616px × 3744px
Photo credit: © Ashley Cooper / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: barge, barrow, boat, carbon, coast, color, colorful, construction, crane, crew, cumbria, deck, employment, energy, environment, farm, furness, goliath, green, hand, heavy, industry, investment, jack, job, jobs, lift, lifting, neutral, offshore, piece, power, ppe, renewable, ship, shore, steel, transition, turbine, uk, walney, weight, wind, worker, yellow