One of the installation’s roads is shown covered in snow on North Post on Jan. 16, 2024, at Fort McCoy, Wis. Between Jan. 9-13, 2024, at Fort McCoy, the installation received more than 18 inches of snow over that span, plus the snowfall was followed by below-zero temperatures. The snowy weather also caused the installation to go to minimal staffing on Jan. 9 and 12 as driving conditions in the local areas were considered less than favorable.


Size: 5779px × 3853px
Photo credit: © Operation 2024 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: directorate, fort, mccoy, operations, public, snow-removal, team, winter, wisconsin, works