Home instruction for sheet metal workers . Fig. 96. View of the Finished Fig. 97. Fig. 97. Connecting Wall, Tube and Leader to Leader Head. Fig. 98. Connecting Gutter The tube is now soldered into the head and finished as in Fig. 97 shows a leader head with a roof tube through thewall. Fig. 98 shows a leader head connected to a hanging the depth the tubes enter the leader heads to preventsplashing. CHAPTER XI -f Octagon Leader Head The method of making up octagon leader heads is the nextlesson, and Fig. 99 shows the 2-in. scale drawing furnished tot


Home instruction for sheet metal workers . Fig. 96. View of the Finished Fig. 97. Fig. 97. Connecting Wall, Tube and Leader to Leader Head. Fig. 98. Connecting Gutter The tube is now soldered into the head and finished as in Fig. 97 shows a leader head with a roof tube through thewall. Fig. 98 shows a leader head connected to a hanging the depth the tubes enter the leader heads to preventsplashing. CHAPTER XI -f Octagon Leader Head The method of making up octagon leader heads is the nextlesson, and Fig. 99 shows the 2-in. scale drawing furnished tothe student. In this drawing the front elevation, the invertedplan and the side elevation are given. When drawing the full size detail, the side elevationcan be omitted. In this casethe tube is made round but asquare or any other shapedtube can be placed in, if de-sired. The height of each memberis scaled from the front ele-vation and placed in Fig. 100on the center line A B, as


Size: 1890px × 1322px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1920, bookpublishernewyo, bookyear1922