110803-N-CV877-123 VIRGINIA BEACH, Va. (Aug. 3, 2011) Seabees participating in the Elevated Causeway System-Modular build drive piles with a pile hammer attached to a 200 ton Crawler crane. Active duty and reserve component Seabees assigned to Amphibious Construction Battalions (PHIBCB) 1 and 2 construct the elevated causeway at least one a year for training. ( Navy photo by Mass Communication Specialist 3rd Class Jonathan Pankau/Released) US Navy 110803-N-CV877-123 Seabees participating in the Elevated Causeway System-Modular build drive piles with a pile hammer attached to a 200 ton


Size: 1940px × 1289px
Photo credit: © PJF Military Collection / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: .., armed, conflict, forces, military, navy, sailor, states, united, war